Sign In | Join Free | My fnxradio.com |
|
Brand Name : JSHG
Model Number : HG-SS-10-750KV
Certification : ISO/CNAS/IAF/CA
Place of Origin : China
MOQ : One 40 HQ Container
Price : negotiation
Payment Terms : L/C, T/T or Western Union
Supply Ability : 3,000 Metric Tons per Month
Delivery Time : 2 weeks per container after PO/drawing/prepayment confirmed
Packaging Details : * Covered by Plastic Wrap or Mat or according to client's requests. * The Loading Pcs of Each Container could be calculated according to client's specification and data.
Application : Electrical Power Transformer Substation / Switch Yard
Voltage Grade : 10 - 750KV
Material : Q235 , Q345 , Q420 , Q460 , Gr.50 , Gr.65 , SS400 , etc.
Appearance Treatment : Hot-dip galvanized / Painting
Welding : Complies with AWS D1.1 standard
Connection Structure : Overlap / Flange connection
Anti Corrosion Steel Framework Galvanized Steel Structure ASTM A123 Standard
Specifications:
Application |
|
Voltage Grade |
|
Shape |
|
Material |
|
Wall thickness |
|
Once Forming |
|
Welding |
|
Joint |
|
Galvanization |
|
Advantages |
|
Product Details
Description:
The electrical substation steel structure is the main load supporting structures of substation, so its quality has direct relation with the safety and reliability of power grid operation.
Our company has 17 years' manufacturing experience as well as advanced equipment, excellent technical staff and mature technology, which will assure the welding quality of steel structures, the galvanization quality and the firmness. Meanwhile, we have a whole set of quality test equipment to determine the physical properties and sizes of all steel structures, ensuring the desirable quality of the whole electrical substation structures.
The surface of all steel structures for constructing the substation could be treated by anti-corrosion techniques, such as hot dip galvanization, powder coated, or painted according to your requests. So the products are wear-resistant, corrosion-resistant and could serve as long as 50 years with less maintenance.
Installation Site
Production Process Flow Chart
Terms and Conditions
1. Price Term: EXW, FOB, CFR or CIF.
2. MOQ: One 40FT Container.
3. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.
4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.
5. Package: Normally wrapped by plastic bags or burlap cloth at the top and bottom, or according to clients requirement.
Contact Us
Jiangsu Hongguang Steel Pole Co., Ltd.
Address: Wanshi Industrial Zone, Yixing City, Jiangsu Pro., P.R.China, 214212
Telephone: +86 510 878 441 56
Fax: +86 510 878 435 28
Mobile: +86 138 615 059 69
Skype: tangjia870124
Please feel free to contact us!
10-750KV Hot Dip Galvanized Electrical Power Substation Steel Structures for Power Transformer Substation.pdf
![]() |
Anti Corrosion Steel Framework Galvanized Steel Structure ASTM A123 Standard Images |